Interface: Yakima Traffic Operations Center - Local Public Safety Dispatch

Yakima Traffic Operations Center to Local Public Safety Dispatch Interface Diagram

Architecture Flow Definitions

emergency route request  (Planned)  Applicable ITS Standards

Request for access routes for emergency response vehicles and equipment. This may be a request for ingress or egress routes or other emergency routes.

evacuation information  (Planned)  Applicable ITS Standards

Evacuation instructions and information including evacuation zones, evacuation times, and reentry times.

incident response status  (Planned)  Applicable ITS Standards

Status of the current incident response including a summary of incident status and its impact on the transportation system, traffic management strategies implemented at the site (e.g., closures, diversions, traffic signal control overrides), and current and planned response activities.

remote surveillance control  (Planned)  Applicable ITS Standards

The control commands used to remotely operate another center's sensors or surveillance equipment so that roadside surveillance assets can be shared by more than one agency.

resource deployment status  (Planned)  Applicable ITS Standards

Status of resource deployment identifying the resources (vehicles, equipment, materials, and personnel) available and their current status. General resource inventory information and specific status of deployed resources may be included.

resource request  (Planned)  Applicable ITS Standards

A request for resources to implement special traffic control measures, assist in clean up, verify an incident, etc. The request may poll for resource availability or request pre-staging, staging, or immediate deployment of resources. Resources may be explicitly requested or a service may be requested and the specific resource deployment may be determined by the responding agency.

road closure notification  (Future)  Applicable ITS Standards

Notification that agency personnel have closed a road due to adverse weather, major incident, or other reason.

road network status assessment  (Planned)  Applicable ITS Standards

Assessment of damage sustained by the road network including location and extent of the damage, estimate of remaining capacity, required closures, alternate routes, necessary restrictions, and time frame for repair and recovery.

transportation system status  (Planned)  Applicable ITS Standards

Current status and condition of transportation infrastructure (e.g., tunnels, bridges, interchanges, TMC offices, maintenance facilities). In case of disaster or major incident, this flow provides an assessment of damage sustained by the surface transportation system including location and extent of the damage, estimate of remaining capacity and necessary restrictions, and time frame for repair and recovery.