Projects

The Regional ITS Architecture provides a starting point for project definition. It provides an overall framework that shows how anticipated projects will integrate with each other and with existing systems. This page lists all the ITS projects that have been mapped to the regional ITS architecture.

ProjectStatusTimeframeDescription
County: Butterfield Road and Terrace Heights Drive IntersectionPlanned Install traffic signal at Butterfield Road and Terrace Heights Drive Intersection.
Selah: Southern Avenue SignalsPlanned Signalize at Southern Avenue and 1st Street
Sunnyside: 13th St @ East Edison Avenue Traffic SignalPlanned Install new traffic signal and intersection improvements.
Sunnyside: 9th St and East Edison SignalPlanned  
Sunnyside: East Edison Avenue Railroad SignalPlanned Install new railroad crossing signal on East Edison Avenue
Union Gap: South 10th Ave - North/South ConnectorPlanned Signalization at Pioneer Street
Wapato: Intersection Improvement West 1st StPlanned West 1st Street and Ahtanum - Install new traffic control signal
Wapato: Intersection School Signal - Camas StPlanned Install a school signal at the intersection of Camas and Dove Lane
WSDOT: US 12/Old Naches Hwy Intersection - ITSPlanned Install cameras, variable message sign, road weather information system, data stations, communications system.
WSDOT: US 97/McDonald Rd/Becker Rd IntersectionPlanned Signalize, make safety improvements, and improve turn lanes.
WSDOT: US 97/South of Toppenish - VMSPlanned Install variable message sign just south of Toppenish for drivers about to enter Satus Pass.